Umiejętności
Civil Engineering
Budowa
Negocjacje kontraktu
Inżynieria
FIDIC
inspekcje
LNG
Zarządzanie
Materiały
Rurociągi
Piping
Project Management
Planowanie projektów
Stal
Steel Structures
Podwykonawstwo
Oczyszczanie ścieków
Wodociągi
Uzdatnianie wody
Slipforming
concrete structures
Języki
polski
ojczysty
angielski
dobry
Doświadczenie zawodowe
Construction/Site Manager of LNG Tanks (MECH)
TANKO S.P.A. - S.A.
Scope of supervised work: Internal steel tanks, external and internal piping, external steel structures, tank insulation
Responsibilities: planning, organization, supervision and control of the mechanical works; providing formal documents required by polish law; quality inspection of works meeting the requirements of Polish Construction Law (Site/Construction Manager).
Responsibilities: planning, organization, supervision and control of the mechanical works; providing formal documents required by polish law; quality inspection of works meeting the requirements of Polish Construction Law (Site/Construction Manager).
Construction Inspector
Siemens Industrial Turbomachinery AB & Siemens Sp. z o.o.
EPC Contract - construction of integrated gasification/combined cycle power plant for EC Gorzów, electric power of 138 MW, Gorzów Wilekopolski Poland;
General Contractor, Siemens Industrial Turbomachinery AB & Siemens Sp. z o.o.
General Contractor, Siemens Industrial Turbomachinery AB & Siemens Sp. z o.o.
CIV Site/Construction Manager of LNG Tanks
Saipem s.p.a - San Donato Milanese (MI), Italy; Via Martiri di Cefalonia 67 (through Adecco)
Continuation of the tasks realized by Hydrobudowa 9 i Hydrobudowa Polska
Responsibilities: planning, building methods, organization, supervision and control of the concrete works for the LNG tank (workers, equipment, supply of materials, quality inspections); coordination and accounting subcontractors works; providing methodologies of the execution of works and other formal documents required by polish law; quality inspection of works meeting the requirements of Polish Construction Law (Construction Manager).
Responsibilities: planning, building methods, organization, supervision and control of the concrete works for the LNG tank (workers, equipment, supply of materials, quality inspections); coordination and accounting subcontractors works; providing methodologies of the execution of works and other formal documents required by polish law; quality inspection of works meeting the requirements of Polish Construction Law (Construction Manager).
CIV Site Manager of LNG Tanks
Responsibilities: planning, building methods, organization, supervision and control of concrete works for the LNG tank (workers, equipment, supply of materials, quality inspections); directly supervision of all activities of the sliding formwork; coordination and accounting subcontractors works; providing methodologies for the execution of works and other formal documents required by polish law; quality inspection of works due to Polish Construction Law (Construction Manager).
CIV Site/ Construction Manager – sliding formwork works
Project: Execution of the external walls of siphon chamber in the slipforming technology for the Contract “Construction of the transmission of wastewater from the left side of Warsaw, to the Czajka wastewater treatment plant - Phase II”
Responsibilities: participation in the development of project documentation for requirements of slipforming technology and in the design of concrete mix, planning construction methods and supervision of the work, providing formal documents required by Polish law, directly managing of works of the sliding formwork (coordination of delivery of concrete and concreting, technical inspections, etc.).
Responsibilities: participation in the development of project documentation for requirements of slipforming technology and in the design of concrete mix, planning construction methods and supervision of the work, providing formal documents required by Polish law, directly managing of works of the sliding formwork (coordination of delivery of concrete and concreting, technical inspections, etc.).
CIV Construction/Site Manager of LNG Tanks
Responsibilities: Participation in the preparation of elements of the offer for the LNG tanks, participation in contract negotiations with clients and subcontracts, planning organization and building methods (workers, equipment, supply of materials, quality inspections),
FIDIC Contracts Specialist,Project Manager (Production Department of the Company's Management Board)
Involved include in the following projects:
1. Poznan Agglomeration: building pumping stations, Hetmańska "with the crowded pipelines in Poznan
2. Construction and modernization of water supply and sewage systems in the municipality of Szklarska Poreba - contract IX Project 2005/PL/16/C/PE/013
3. Construction of sanitary and rainwater sewage system in the town of Tychy in the districts Zwierzyniec Wartogłowiec and Zawiść and regulation of field watercourses.
4. Construction of Lower Vistula Terrace Collector (DTW) Stage II II in Krakow
5. Construction of wastewater transmission system of left bank of Warsaw to the sewage treatment plant "Czajka" - Stage II.2
6. “Łyna”sewage treatment plant in Olsztyn
7. Modernization of the water supply system SW-4 "Czyżkówko" in Bydgoszcz-Part 2-Artificial infiltration
8. The construction of the expressway S5 Poznan (A-2 junction "Głuchowo") - Wroclaw (A-8 junction "Widawa"), section Kaczkowo-Korzeńsko, Bypass Bojanów and Rawicz
9. Sewage Management in the Zielona Gora and Swidnica Contract No. 2004/Pl/16/C/Pe/029 Task No. 5
10. The modernization and development of the sewerage system - Poznan stage 1 and 2 Contract: 2000/PL/16/P/PE/015-02
1. Poznan Agglomeration: building pumping stations, Hetmańska "with the crowded pipelines in Poznan
2. Construction and modernization of water supply and sewage systems in the municipality of Szklarska Poreba - contract IX Project 2005/PL/16/C/PE/013
3. Construction of sanitary and rainwater sewage system in the town of Tychy in the districts Zwierzyniec Wartogłowiec and Zawiść and regulation of field watercourses.
4. Construction of Lower Vistula Terrace Collector (DTW) Stage II II in Krakow
5. Construction of wastewater transmission system of left bank of Warsaw to the sewage treatment plant "Czajka" - Stage II.2
6. “Łyna”sewage treatment plant in Olsztyn
7. Modernization of the water supply system SW-4 "Czyżkówko" in Bydgoszcz-Part 2-Artificial infiltration
8. The construction of the expressway S5 Poznan (A-2 junction "Głuchowo") - Wroclaw (A-8 junction "Widawa"), section Kaczkowo-Korzeńsko, Bypass Bojanów and Rawicz
9. Sewage Management in the Zielona Gora and Swidnica Contract No. 2004/Pl/16/C/Pe/029 Task No. 5
10. The modernization and development of the sewerage system - Poznan stage 1 and 2 Contract: 2000/PL/16/P/PE/015-02
Szkolenia i kursy
Certyfikaty:
- Contractor Trade Licence/ Unlimited construction license
- Independent engineer consultant (SIDIR at FIDIC)
- Contractor Trade Licence/ Unlimited construction license
- Independent engineer consultant (SIDIR at FIDIC)
Edukacja
Specjalizacje
Budownictwo
Infrastrukturalne
Budownictwo
Mieszkaniowe/Przemysłowe
Budownictwo
Zarządzanie budownictwem
Zainteresowania
New technology, culture and sport the Far East, sports, photography, architecture, travel