Umiejętności
Abaqus
ANSYS
Projektowanie wspomagane komputerowo
Catia
Analiza elementów skończonych
Microsoft Excel
OneNote
Pro Engineer
SAP
Metal w arkuszach
Solidworks
Visio
Teamcenter PDM
NX 8.5
Języki
polski
ojczysty
angielski
biegły
Doświadczenie zawodowe
Design Engineer
Role: Support Product Platform/TechnologyPlatform in Compaction, Volvo Construction Equipment
Since September 2013 till Jully 2014 work on site in Shippensburg USA.
Currently I'm working in Wroclaw supporting System Engineers in US.
- Creating environments for new machines
- Tracking list, with required changes after global check
- Supporting Technology Platforms
Since September 2013 till Jully 2014 work on site in Shippensburg USA.
Currently I'm working in Wroclaw supporting System Engineers in US.
- Creating environments for new machines
- Tracking list, with required changes after global check
- Supporting Technology Platforms
Design Engineer
On the Electric Team
- Solving existing problems and on different machines.
- Combined tasks with electrical and mechanical issues
- Design of new steel parts to improve routing and functionality of Wiring harnesses mounted on the machines
On Structure & Exterior Team
Compactors
- Cost reduction, creating new design of swivels
- Creating environment for new machine
- Searching possibilities for mass reduction
- Creating drawings and 3D models for new concepts
Wheel Loaders
-Creating new 3D models and drawings according to Volvo standards, refering to old drawings and models
- Solving issues from assembly line by creating additional marks on wires which helps to mount parts on the machine. Delivering infomation how to assemble new parts correctly
Articulated Hauler
- Designing sheetmetal plates according to smaller machines, introducing more efficient shapes. Preparing documentation for P release and plastic parts.
Backhoe Loader
- Solving existing problems on the machine, for instance new locking system for pedals with fit and function test. New arrangement for three different antennas on Cab frame, due to water leackage problem. Taking responsibility from beginning(concept), through making tests with fitters on assembly line to implementation on production line. Creating own prototypes on protoshop, which helps to rush up process of implementation new parts on production line.
- Two weeks spent on site during P-release phase eliminating minor issues on machine
Compact Excavator
- New arrangement of cables due the fact of changing potential on main switch, design of bracket for fuse and new routing of wires with omitting potentially dangerous places. Creating assembly drawings and making progres in Prost structure.
- Solving existing problems and on different machines.
- Combined tasks with electrical and mechanical issues
- Design of new steel parts to improve routing and functionality of Wiring harnesses mounted on the machines
On Structure & Exterior Team
Compactors
- Cost reduction, creating new design of swivels
- Creating environment for new machine
- Searching possibilities for mass reduction
- Creating drawings and 3D models for new concepts
Wheel Loaders
-Creating new 3D models and drawings according to Volvo standards, refering to old drawings and models
- Solving issues from assembly line by creating additional marks on wires which helps to mount parts on the machine. Delivering infomation how to assemble new parts correctly
Articulated Hauler
- Designing sheetmetal plates according to smaller machines, introducing more efficient shapes. Preparing documentation for P release and plastic parts.
Backhoe Loader
- Solving existing problems on the machine, for instance new locking system for pedals with fit and function test. New arrangement for three different antennas on Cab frame, due to water leackage problem. Taking responsibility from beginning(concept), through making tests with fitters on assembly line to implementation on production line. Creating own prototypes on protoshop, which helps to rush up process of implementation new parts on production line.
- Two weeks spent on site during P-release phase eliminating minor issues on machine
Compact Excavator
- New arrangement of cables due the fact of changing potential on main switch, design of bracket for fuse and new routing of wires with omitting potentially dangerous places. Creating assembly drawings and making progres in Prost structure.
Szkolenia i kursy
Modeling in CATIA (certified 40h)
Pro-E training with PDMLink-Windchil (certified 40h)
Other courses at Wroclaw University of Technology: Abaqus, Catia, Pro-E, Fluent, Inventor, I-deas, Solid Works
Pro-E training with PDMLink-Windchil (certified 40h)
Other courses at Wroclaw University of Technology: Abaqus, Catia, Pro-E, Fluent, Inventor, I-deas, Solid Works
Edukacja
Specjalizacje
Inżynieria
Mechanika/Lotnictwo
Zainteresowania
volleyball, snowboard, books, languages, music