Języki
polski
ojczysty
angielski
dobry
norweski
podstawowy
Doświadczenie zawodowe
Project manager/Package owner
Key skills
• Experienced in offshore drilling and production installations design and maintenance projects
• Work with NORSOK, DNV and other offshore standards
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
Responsibilities
• Managing of engineers
• Follow up in design process and offshore installation work
• Fabrication supervision
• Participation in factory acceptance tests
• Offshore installation supervision
• Cost estimates preparation
• Cooperation with vendors
• Project plans preparation and follow up
• Project budgets preparation and follow up
• Establishing new tasks, solutions and budgets
• Preparation of detailed instructions for installation an work packages
Key achievements
• Jan.-Oct. 2011 – West Elara Cuttings re-injection system - pre-engineering, detail engineering, prefabrication and installation preparation for main CRI units.
• Oct. 2011-Mar. 2012 – West Elara yard stay:
- installation of CRI main units: cuttings blowers, storage tanks, air compressors, slurrification unit, skip station, offloading stations and corresponding piping system.
- installation of cuttings screw conveyour
• Mar.2012-Aug. 2012 – West Elara Cuttings re-injection system - detail engineering, prefabrication and installation preparation for remaining CRI elements.
• Aug. 2011-Dec. 2012 – West Elara offshore:
- installation of CRI system: Injection pump with VSD unit, slurry low and high pressure piping, slop and sea water piping. CRI system testing, commissioning and start-up.
- installation of shear guns in mud pits.
- installation of hookup system between Jack up rig and Jacket: hook up platforms, stair towers, hookup hoses.
- installation of annulus testing system.
- installation of fire water monitors.
- pre-engineering for mud cooler installation.
• Experienced in offshore drilling and production installations design and maintenance projects
• Work with NORSOK, DNV and other offshore standards
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
Responsibilities
• Managing of engineers
• Follow up in design process and offshore installation work
• Fabrication supervision
• Participation in factory acceptance tests
• Offshore installation supervision
• Cost estimates preparation
• Cooperation with vendors
• Project plans preparation and follow up
• Project budgets preparation and follow up
• Establishing new tasks, solutions and budgets
• Preparation of detailed instructions for installation an work packages
Key achievements
• Jan.-Oct. 2011 – West Elara Cuttings re-injection system - pre-engineering, detail engineering, prefabrication and installation preparation for main CRI units.
• Oct. 2011-Mar. 2012 – West Elara yard stay:
- installation of CRI main units: cuttings blowers, storage tanks, air compressors, slurrification unit, skip station, offloading stations and corresponding piping system.
- installation of cuttings screw conveyour
• Mar.2012-Aug. 2012 – West Elara Cuttings re-injection system - detail engineering, prefabrication and installation preparation for remaining CRI elements.
• Aug. 2011-Dec. 2012 – West Elara offshore:
- installation of CRI system: Injection pump with VSD unit, slurry low and high pressure piping, slop and sea water piping. CRI system testing, commissioning and start-up.
- installation of shear guns in mud pits.
- installation of hookup system between Jack up rig and Jacket: hook up platforms, stair towers, hookup hoses.
- installation of annulus testing system.
- installation of fire water monitors.
- pre-engineering for mud cooler installation.
Senior Piping Engineer
Key skills
• Work with NORSOK and offshore standards
• Design in 3D CAD software
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
• Very good knowledge in terms of rig mud systems, units and solutions.
Responsibilities
• Preparing 3D models of piping systems, equipment and arrangement of installations, machines etc.
• Preparing ISO drawings, Plot Plans and General arrangement drawings
• Piping supports design
• MTO’s preparation
• Managing of multidisciplinary 3D models (cooperation with disciplines leaders)
• Managing of draft engineers
• Offshore and on site measures
• Assistance in offshore installation work
• Cooperation with other disciplines engineers (establishing of connection points)
• Cost estimates preparation
• Cooperation with vendors
Key achievements
• Designing of mud system in Heidrun offshore platform, responsible for piping discipline (piping system ISO drawings – preparation and control, general arrangement and partially mechanical equipment).
• Oct.-Dec. 2007 – work mainly offshore (Heidrun platform), assistance in installation period, author supervising.
• Jan.-May 2008 – Preparing final project documentation for piping scope - as built documentation and MC packages (Heidrun Mud System Modification Project).
• May-August 2008 - Pre engineering phase in Gullfaks Mud System Modification Project.
Project handbook and Material Take Off (MTO) preparation.
• Sep. 2008-January 2009 – Troll Drilling and Work over rig Study project.
Piping and layout leader. Managing of 3D multidisciplinary model, piping designing, layout design, MTO’s preparation.
• Jan. 2008-Nov 2009 – Gullfaks A/B/C MPA and Mud lab Studies.
Piping and layout leader. Managing of 3D multidisciplinary model, piping design, layout design, MTO’s preparation. Responsible for Weight discipline, preparation of weight balance sheet and inputs to cost estimate.
• Dec. 2009 – West Navigator Yard Stay.
Piping and layout leader. Piping design, layout design, MTO’s preparation. Drawing quality control, Work package preparation.
• Jan. 2010 – Aker Barents, Aker Spitsbergen, New Welding Workshop, New Hose Workshop.
Engineering manager. Managing of multidisciplinary engineering team. Also responsible for Piping&Layout discipline, responsible for HSE discipline at pre engineering phase.
• Jul. 2010 – West Epsilon - New slop system.
Engineering manager in pre-engineering phase. Responsible also for piping and layout discipline, 3D modelling, drawings, MTO, MEL, cost estimate and study report preparation.
• Work with NORSOK and offshore standards
• Design in 3D CAD software
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
• Very good knowledge in terms of rig mud systems, units and solutions.
Responsibilities
• Preparing 3D models of piping systems, equipment and arrangement of installations, machines etc.
• Preparing ISO drawings, Plot Plans and General arrangement drawings
• Piping supports design
• MTO’s preparation
• Managing of multidisciplinary 3D models (cooperation with disciplines leaders)
• Managing of draft engineers
• Offshore and on site measures
• Assistance in offshore installation work
• Cooperation with other disciplines engineers (establishing of connection points)
• Cost estimates preparation
• Cooperation with vendors
Key achievements
• Designing of mud system in Heidrun offshore platform, responsible for piping discipline (piping system ISO drawings – preparation and control, general arrangement and partially mechanical equipment).
• Oct.-Dec. 2007 – work mainly offshore (Heidrun platform), assistance in installation period, author supervising.
• Jan.-May 2008 – Preparing final project documentation for piping scope - as built documentation and MC packages (Heidrun Mud System Modification Project).
• May-August 2008 - Pre engineering phase in Gullfaks Mud System Modification Project.
Project handbook and Material Take Off (MTO) preparation.
• Sep. 2008-January 2009 – Troll Drilling and Work over rig Study project.
Piping and layout leader. Managing of 3D multidisciplinary model, piping designing, layout design, MTO’s preparation.
• Jan. 2008-Nov 2009 – Gullfaks A/B/C MPA and Mud lab Studies.
Piping and layout leader. Managing of 3D multidisciplinary model, piping design, layout design, MTO’s preparation. Responsible for Weight discipline, preparation of weight balance sheet and inputs to cost estimate.
• Dec. 2009 – West Navigator Yard Stay.
Piping and layout leader. Piping design, layout design, MTO’s preparation. Drawing quality control, Work package preparation.
• Jan. 2010 – Aker Barents, Aker Spitsbergen, New Welding Workshop, New Hose Workshop.
Engineering manager. Managing of multidisciplinary engineering team. Also responsible for Piping&Layout discipline, responsible for HSE discipline at pre engineering phase.
• Jul. 2010 – West Epsilon - New slop system.
Engineering manager in pre-engineering phase. Responsible also for piping and layout discipline, 3D modelling, drawings, MTO, MEL, cost estimate and study report preparation.
Discipline manager - Piping
Key skills
• Work with NORSOK and offshore standards
• Design in 3D CAD software
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
Responsibilities
• Preparing 3D models of piping systems and general arrangement of installations
• Managing of Draft engineers
• Offshore and on site messures
• Cooperation with other disciplines engineers (establishing of connection points)
Key achievements
• As built documentation (measurements and ISO drawings) of chemical factory in Svelgen:
hydrochloric acid lines, sulphuric acid lines, fresh water lines, sea water lines, hydrogen lines, piping supports, layout.
• Pre engineering documentation of chemical factory in Svelgen and Kristiansand
• Designing of piping (cooling water) system in metallurgy factory
• 3D presentation of petrochemical factory for Bremanger Komune
• Designing of mud system in Heidrun offshore platform, responsible for piping discipline (piping system ISO drawings – preparation and control, general arrangement and partially equipment):
- mud lines – 3–14 inch, gravity flows and high pressure – 690 bar,
- sea water lines – 1–3 inch, PN 20 bar
- fresh water lines, plant air lines – 0,5-1,5 inch, PN 10 bar
- piping supports
- P&ID’s preparation and control
- offshore installation instruction
- as built documentation
- offshore measurements
- multidisciplinary check
• Work with NORSOK and offshore standards
• Design in 3D CAD software
• Work in multinational team
• Work In Client offices in Norway
• Work offshore
Responsibilities
• Preparing 3D models of piping systems and general arrangement of installations
• Managing of Draft engineers
• Offshore and on site messures
• Cooperation with other disciplines engineers (establishing of connection points)
Key achievements
• As built documentation (measurements and ISO drawings) of chemical factory in Svelgen:
hydrochloric acid lines, sulphuric acid lines, fresh water lines, sea water lines, hydrogen lines, piping supports, layout.
• Pre engineering documentation of chemical factory in Svelgen and Kristiansand
• Designing of piping (cooling water) system in metallurgy factory
• 3D presentation of petrochemical factory for Bremanger Komune
• Designing of mud system in Heidrun offshore platform, responsible for piping discipline (piping system ISO drawings – preparation and control, general arrangement and partially equipment):
- mud lines – 3–14 inch, gravity flows and high pressure – 690 bar,
- sea water lines – 1–3 inch, PN 20 bar
- fresh water lines, plant air lines – 0,5-1,5 inch, PN 10 bar
- piping supports
- P&ID’s preparation and control
- offshore installation instruction
- as built documentation
- offshore measurements
- multidisciplinary check
Mining Specialist
Key skills
• Technical knowledge of design standards
• Expirience In teamwork (also with other disciplines)
• Work with CAD software
• Good knowledge regarding market of Oil and Gas sector
• Good knowledge regarding designd codes and standards
Responsibilities
• Leadership in design process
• Managing of constuction jobs
• Partially investments handling at procurement side
• Cooperation with Office of Technical Inspection concerning project documentation agreements and preparing technical reception and registration documentation and technical reception of gas infrastructure buildings,
Key achievements
• Designing of Light Oil Transformation Center in Slawoborze
Piping discipline leader – oil high pressure pipelines – DN80 and 100 PN 420 Bar, length appr. 6,5 km, inlet manifolds, pressure reduction manifolds, flow measuring station, degassers installation, truck cistern loading installation, general arrangement.
• Designing of renovation of methanol storage in Gorzyslaw
• Designing and managing of installation of gas production plant in Antonin
Project leader and Piping discipline leader – methanol dispenser, mine pipelines, pressure reduction manifold, waste water tanks installation, flow measuring station, truck cistern loading installation, outlet manifold, general arrangement.
• Designing of drilling and mining fluids processing plant In Debno
• Designing and managing LNG reegasing installation In Gozdnica
Project leader and piping installation leader – LNG tanks installation, gas pressure stabilisation installation, general arrangement.
• Technical knowledge of design standards
• Expirience In teamwork (also with other disciplines)
• Work with CAD software
• Good knowledge regarding market of Oil and Gas sector
• Good knowledge regarding designd codes and standards
Responsibilities
• Leadership in design process
• Managing of constuction jobs
• Partially investments handling at procurement side
• Cooperation with Office of Technical Inspection concerning project documentation agreements and preparing technical reception and registration documentation and technical reception of gas infrastructure buildings,
Key achievements
• Designing of Light Oil Transformation Center in Slawoborze
Piping discipline leader – oil high pressure pipelines – DN80 and 100 PN 420 Bar, length appr. 6,5 km, inlet manifolds, pressure reduction manifolds, flow measuring station, degassers installation, truck cistern loading installation, general arrangement.
• Designing of renovation of methanol storage in Gorzyslaw
• Designing and managing of installation of gas production plant in Antonin
Project leader and Piping discipline leader – methanol dispenser, mine pipelines, pressure reduction manifold, waste water tanks installation, flow measuring station, truck cistern loading installation, outlet manifold, general arrangement.
• Designing of drilling and mining fluids processing plant In Debno
• Designing and managing LNG reegasing installation In Gozdnica
Project leader and piping installation leader – LNG tanks installation, gas pressure stabilisation installation, general arrangement.
Deposit Reporter
Key skills
• Technical knowledge of design standards
• Expirience In teamwork (also with other disciplines)
• Work with CAD software
• Good knowledge regarding market of Oil and Gas sektor
• Good knowledge regarding designd codes and standards
Responsibilities
• Leadership in design process
• Managing of constuction jobs
• Partially investments handling at procurement side
• Cooperation with Office of Technical Inspection concerning project documentation agreements and preparing technical reception and registration documentation and technical reception of gas infrastructure buildings
Key achievements
• Designing and managing of natural gas mines construction (on shore) Kościan 18H,
• Designing and managing of measurement systems in Natural Gas Mines – Antonin, Brzostowo, Jarocin, Barnowko
• Designing and managing connection to high pressure gas pipeline system (operating) with gas measurement station (high pressure) and gas reduction & measurement station and barrage / outlet system
• Technical knowledge of design standards
• Expirience In teamwork (also with other disciplines)
• Work with CAD software
• Good knowledge regarding market of Oil and Gas sektor
• Good knowledge regarding designd codes and standards
Responsibilities
• Leadership in design process
• Managing of constuction jobs
• Partially investments handling at procurement side
• Cooperation with Office of Technical Inspection concerning project documentation agreements and preparing technical reception and registration documentation and technical reception of gas infrastructure buildings
Key achievements
• Designing and managing of natural gas mines construction (on shore) Kościan 18H,
• Designing and managing of measurement systems in Natural Gas Mines – Antonin, Brzostowo, Jarocin, Barnowko
• Designing and managing connection to high pressure gas pipeline system (operating) with gas measurement station (high pressure) and gas reduction & measurement station and barrage / outlet system
Szkolenia i kursy
Falc Nutec
Basic Safety and Emergency Preparedness Training for offshore
Basic Safety and Emergency Preparedness Training for offshore
Edukacja
Specjalizacje
IT - Rozwój oprogramowania
Zarządzanie projektem
Zainteresowania
Sport (volleyball, ice skating, squash, swimming, table tennis).
Second World War history
Second World War history
Inne
Technical skills:
2D and 3D CAD software, NORSOK, DNV and other design codes and standards, knowledge regarding oil and gas market
Computer skills:
MS Office (Word, Excel, Power Point, Outlook), AutoCAD, Autodesk INVENTOR, SketchUp, MS Project, Microstation – Basic user course.
2D and 3D CAD software, NORSOK, DNV and other design codes and standards, knowledge regarding oil and gas market
Computer skills:
MS Office (Word, Excel, Power Point, Outlook), AutoCAD, Autodesk INVENTOR, SketchUp, MS Project, Microstation – Basic user course.
Grupy
Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie
Akademia Górniczo-Hutnicza to jedna z najlepszych i najbardziej renomowanych polskich uczelni, od lat zajmująca czołowe miejsca w rankingach szkół wyższych. Przoduje w dziedzinie nowocze
Globetek. Praca dla inżyniera w energetyce i petrochemii
Grupa kierowana do inżynierów zainteresowanych pracą w budownictwie przemysłowym w branży energetycznej i petrochemicznej na terenie Polski i za granicą.
INSTALACJE RUROWE
Systemy rurowe wraz armaturą oraz powiązane materiały -w budownictwie, przemyśle, chemii i w domu, wod-kan-gaz. Porady, wymiana doświadczeń. Poszukiwanie usług i produktów. Kontakty handlowe.